The Oklahoma Safety Council (OSC) now offers a variety of site specific computer-based courses that are available by appointment only. To make reservations for CBT training in Tulsa, contact Suzi at 918-622-4771 to arrange for available classes. To make reservations for CBT training in Oklahoma City, contact Barbara at 405-848-8626 to arrange for available classes.
If you're interested in a course that is not listed contact the OSC to discuss as we may be able to administer them for you.
Oklahoma Safety Council is now providing the Baker Hughes Barnsdall Site Specific training. We will hold a class at 2 p.m. on Tuesday, following the BOP, and the class will also be available in our computer lab. For the computer training please call 918.622.4771 to make an appointment.
| Course ID | Course Name | Cost Member/Non |
|---|---|---|
| 19OQABN | ABNORMAL CONDITIONS AND SAFETY | 20/30 |
| 19ASFIRE | ALTAIRSSTRICKLAND FIREWATCH | 20/30 |
| 19ASHELP | ALTAIRSSTRICKLAND HELPER | 20/30 |
| 19ASBOIL | ALTAIRSTRICKLAND BOILERMAKER | 20/30 |
| 19ASCS | ALTAIRSTRICKLAND CONFINED SPACE | 20/30 |
| 19ASFORE | ALTAIRSTRICKLAND FOREMAN | 20/30 |
| 19ASFORK | ALTAIRSTRICKLAND FORKLIFT | 20/30 |
| 19ASLAB | ALTAIRSTRICKLAND LABORERS | 20/30 |
| 19ASPIPE | ALTAIRSTRICKLAND PIPEFITTER | 20/30 |
| 19ASRIG | ALTAIRSTRICKLAND RIGGING | 20/30 |
| 19ALTAIR | ALTAIRSTRICKLAND SAFETY TRAINING | 20/30 |
| 19ASPROS | ALTIARSTRICKLAND SAFETY PROFESSIONAL | 20/30 |
| A19CSE | ARSC CONFINED SPACE | 20/30 |
| 19ASBAW | ASBESTOS AWARENESS | 20/30 |
| 19OQATMC | ATMOSPHIRIC CORROSION | 20/30 |
| 12OKBHB | BAKER HUGHES BARNSDALL SITE ORIENTATION | 20/30 |
| 19OQPLCS | BASIC ELECTRONICS: PLCS | 20/30 |
| 19OQSCDA | BASIC ELECTRONICS: SCADA | 20/30 |
| 26BOPR | BASIC ORIENTATION PLUS | 40/65 |
| 19BENZEN | BENZENE AWARENESS | 20/30 |
| 03BROCKW | BROCK NEW HIRE WEB | |
| 19CSL | CAT SPEC, LTD | 30/40 |
| 19OQRIT | CATHODIC PROTECTION CRITERIA | 20/30 |
| 19OQCTHP | CATHODIC PROTECTION TROUBLESHOOTING | 20/30 |
| 19OQRECT | CATHODIC PROTECTION-RECTIFIER | 20/30 |
| 19OQCGI | CGI’S & FLAME IONIZATION | 20/30 |
| 19OQGAS | CHARACTERISTICS & PROPERTIES OF NATURAL GAS | 20/30 |
| 08CVXMS | CHEVRON PASCAGOULA SITE ORIENTATION | 30/40 |
| 19CITGOL | CITGO LEMONT REFINERY | 20/30 |
| 19CITHF | CITGO LEMONT REFINERY HF | 20/30 |
| 12CODUSP | COMBUSTIBLE DUST AWARENESS FOR COAL PROCTORED | 20/30 |
| 19OQCCYL | COMPRESSOR OPERATION: COMPRESSOR | 20/30 |
| 19OQGSPI | COMPRESSOR OPERATION: GAS PATH | 20/30 |
| 19OQENBL | COMPRESSOR OPERATION: POWER CYLINDER | 20/30 |
| 19OQTRBU | COMPRESSOR OPERATION: TURBINE | 20/30 |
| 1224DOW | DOW LOUISIANA OPERATIONS, PLAQUEMINE LA | 20/30 |
| 05TXO | EASTMAN CHEMICAL COMPANY | 75/85 |
| 05TXOCS | EASTMAN CHEMICAL CONFINED | 55/65 |
| 10OQELFS | ELECTROFUSION | 20/30 |
| 19EPC | ELITE PIPING & CIVIL | 30/40 |
| 19OQEMER | EMER. PLANS & PUBLIC CONTRACTOR | 20/30 |
| 19EMCOMBO | EXXONMOBIL BAYTOWN COMBO | 20/30 |
| 19EMSO | EXXONMOBIL BAYTOWN GENERAL SAFETY ORIENTATION | 20/30 |
| 19FIRE | FIREWATCH | 20/30 |
| 19OQELCF | FUNDAMENTALS OF ELECTRICITY | 20/30 |
| 19OQECNT | GAS CONTROL | 20/30 |
| 12GGSU | GEORGIA GULF SITE AND UNIT ORIENTATION | 20/30 |
| 19OQHOTT | HOT TAPPING & STOPPING | 20/30 |
| HOV0028 | HOVENSA CONFINED SPACE ENTRANT | 20/30 |
| 19HVNSAC | HOVENSA CONTRACTOR ORIENTATION | 30/40 |
| 19HVNSAV | HOVENSA LIMITED ACCESS | 20/30 |
| 19HVNSWP | HOVENSA WORK PERMITS | 30/40 |
| 19OQHRPS | HR: HUMAN PERFORMANCE SYSTEMS | 20/30 |
| 19OQHRJE | HR: JOB PERFORMANCE EVALUATION | 20/30 |
| 19OQHRMP | HR: THE MENTORING PROCESS | 20/30 |
| 19 H2S1 | HYDROGEN SULFIDE AWARENESS | 20/30 |
| 19OQRVLV | INSPECTION & TESTING RELIEF VALVES | 20/30 |
| 19OQANOD | INSTALLATION OF ANODES | 20/30 |
| 19OQSTLM | INSTALLATION OF STEEL MAINS | 20/30 |
| 19OQITST | INSTALLATION OF TEST STATIONS | 20/30 |
| 19OQPLS1 | INSTALLATION PLASTIC MAINS – PT 1 | 20/30 |
| 19OQPLS2 | INSTALLATION PLASTIC MAINS – PT 2 | 20/30 |
| 19OQACDC | INTERFERENCE (AC/DC) | 20/30 |
| 19OQINTC | INTERNAL CORROSION MONITORING | 20/30 |
| 19OQPINV | INVESTIGATION PIPELINE FAILURE | 20/30 |
| 19JVFLB | JV FLANGE & LINE BR | 20/30 |
| 19JVI | JV INDUSTRIAL COMPANIES | 20/30 |
| 19JVLEAK | JV INDUSTRIAL LEAK TESTING | 20/30 |
| 19JVTORQ | JV INDUSTRIAL TORQUE TOOLS | 20/30 |
| 19JVVFLB | JV VI FLANGE ASSEMBLY & FIRST LINE BREAK | 20/30 |
| 19JVVTRQ | JV VI HOW TO SAFELY USE TORQUE TOOLS | 20/30 |
| 19JVVLK | JV VI HYDROSTATIC & PNEUMATIC LEAK TESTING | 20/30 |
| 19JVVIR | JV VIRGIN ISLANDS | 20/30 |
| 19JVVHS | JV VIRGIN ISLANDS HAND SAFETY | 20/30 |
| 19JVVCRC | JV VIRGIN ISLANDS HEXAVALENT CHROMIUM | 20/30 |
| 19JVVSCF | JV VIRGIN ISLANDS SCAFFOLD ERECTORS & DISMANT | 20/30 |
| 19OQPFAIL | LEAK & PIPELINE FAILURE | 20/30 |
| 19OQLEAK | LEAK SURVEY & CLASSIFICATION | 20/30 |
| 19LOTO | LOCKOUT TAGOUT | 20/30 |
| 19OQLQAS | LQ: ANNUAL SURVEYS | 20/30 |
| 19OQLQST | LQ: INSPECTION – ABOVE GROUND | 20/30 |
| 19OQLQIA | LQ: INSTALLATION OF ANODES | 20/30 |
| 19OQLQAC | LQ: INTERFERENCE (AC & DC) | 20/30 |
| 19OQLQPO | LQ: INTRODUCTION TO COMPRESSOR | 20/30 |
| 91OQLQPP | LQ: PIPELINE PATROL | 20/30 |
| 19OQLQSC | LQ: PIPELINE SYSTEM CONTROL | 20/30 |
| 19OQLQRI | LQ: PIPELINE SYSTEM CONTROL | 20/30 |
| 19OQLQPS | LQ: PRESSURE SWITCHES | 20/30 |
| 19OQLQPT | LQ: PRESSURE TRANSMITTERS | 20/30 |
| 19OQLQLC | LQ: PROGRAMMABLE LOGIC CONTROL | 20/30 |
| 19OQLQBP | LQ:BELOW GROUND PIPE COATING | 20/30 |
| 19OQLQCP | LQ:CATHODIC PROTECTION –ABO | 20/30 |
| WMCTELEC | MARATHON CONFINED SPACE ENTRY AWARENESS | 20/30 |
| WMCTNEKEC | MARATHON ELECTRICAL SAFETY NON-ELECTRICAL WORKERS | 20/30 |
| WMCTELVW | MARATHON ELEVATED WORK | 20/30 |
| WMCTGSWI | MARATHON GENERAL SAFETY | 20/30 |
| WMCTHFA | MARATHON HF ALKY SAFETY | 20/30 |
| 12MARAHF | MARATHON HF ORIENTATION – GARYVILLE LA | 30/40 |
| WMCTHT | MARATHON HOT TAP/IN SERVICE WELD | 20/30 |
| WMSRHW | MARATHON HOT WORK | 20/30 |
| WMCTINERT | MARATHON INERT ENTRY | 20/30 |
| WMCTLOTOA | MARATHON LOCKOUT/TAGOUT | 20/30 |
| WMCTLOTOS | MARATHON LOTO SUPERVISOR/SAFETY | 20/30 |
| WMCTMMFA | MARATHON MARINE FACILITIES AWARENESS | 20/30 |
| WMCTOPP | MARATHON OPENING PROCESS PIPING | 20/30 |
| WMCTSWP | MARATHON SAFE WORK PERMIT | 20/30 |
| 12MARLA | MARATHON SITE ORIENTATION- GARYVILLE LA | 30/40 |
| 07MATRIX | MATRIX SERVICES COMPANY COURSE | 30/40 |
| 19OQMECH | MECHANICAL FITTINGS | 20/30 |
| 12MOTIVA | MOTIVA-CONVENT SITE & UNIT ORIENTATION | |
| 12MOUSA | MURPHY OIL SITE ORIENTATION – CHALMETTE LA | 20/30 |
| 19OQSAFT | NATURAL GAS OPERATIONS | 20/30 |
| 19OQODOR | ODORIZATION | 20/30 |
| 19OQOQS | OPERATOR QUALIFICATION SUMMARY | 20/30 |
| 19OQRIGG | OSHA RIGGING – INSPECTION | 20/30 |
| 19OQEXCV | OSHA/DOT – EXCAVATION SAFETY | 20/30 |
| 19OQOAWL | OXYGEN/ACETYLENE WELDING | 20/30 |
| 19PRSI | PASADENA REFINING SYSTEM SITE | 60/70 |
| 19OQPSSR | PIPE-TO-SOIL SURVEYS | 20/30 |
| 19OQPCRS | PIPELINE CROSSING | 20/30 |
| 19OQPLKR | PIPELINE LEAK REPAIR | 20/30 |
| 19OQPIG | PIPELINE PIGGING | 20/30 |
| 19OQPURG | PIPELINE PURGING | 20/30 |
| 19OQSHUT | PIPELINE SHUTDOWN & STARTUP | 20/30 |
| 19OQPPFS | PLASTIC PIPE FUSION | 20/30 |
| 19OQFPSP | PLASTIC PIPE FUSION – SPANISH | 20/30 |
| 19OQPLPT | POPULATION DENSITY CHANGE | 20/30 |
| 12ENTFR | POWERSAFE ENTERGY FOSSIL REFRESHER | 20/30 |
| 12ENTFRS | POWERSAFE ENTERGY FOSSIL REFRESHER (SPANISH) | 20/30 |
| 12ENTFO | POWERSAFE ENTERGY FOSSIL SPECIFIC | 20/30 |
| 12ENTFOS | POWERSAFE ENTERGY FOSSIL SPECIFIC (SPANISH) | 20/30 |
| 12PSEXT | POWERSAFE EXTENDED ORIENTATION | 25/35 |
| 12PSGENP | POWERSAFE GENERATION PROCTORED | 40/50 |
| 12PSGNPS | POWERSAFE GENERATION PROCTORED (SPANISH) | 40/50 |
| 12PSGNRP | POWERSAFE GENERATION REFRESHER PROCTORED | 20/30 |
| 12PSGRSP | POWERSAFE GENERATION REFRESHER SPANISH PROCTORED | 20/30 |
| 12PSLINE | POWERSAFE LINEMAN ORIENTATION | 20/30 |
| 12PSMETR | POWERSAFE METER READERS SPECIFIC ORIENTATION | 30/40 |
| 12PSMETS | POWERSAFE METER SERVICES SPECIFIC ORIENTATION | 30/40 |
| 12PSOBSP | POWERSAFE OBSERVER/SPOTTER | 20/30 |
| 12SCGEN | POWERSAFE SOUTHERN COMPANY SAFETY CULTURE | 15/25 |
| 12PSSUB | POWERSAFE SUBSTATION ORIENTATION | 25/35 |
| 12PSBASE | POWERSAFE T&D BASELINE ORIENTATION | 40/50 |
| 12PSREF | POWERSAFE T&D BASELINE REFRESHER ORIENTATION | 20/30 |
| 12PSBASP | POWERSAFE T&D BASELINE SPANISH ORIENTATION | 40/50 |
| 12PSREFS | POWERSAFE T&D REFRESHER SPANISH ORIENTATION | 20/30 |
| 12PSTTC | POWERSAFE TEMPORARY TRAFFIC CONTROL | 20/30 |
| 12PSVEG | POWERSAFE VEGETATION ORIENTATION | 20/30 |
| 12PSVESP | POWERSAFE VEGETATION SPANISH ORIENTATION | 20/30 |
| 12PRAXGE | PRAXAIR SITE ORIENTATION - GEISMAR LA | 20/30 |
| 19OQPTST | PRESSURE TESTING STEEL & PLASTIC | 20/30 |
| 19OQIGN | PREVENTING ACCIDENTAL IGNITION | 20/30 |
| 19OQCOAT | PROTECTIVE COATINGS | 20/30 |
| 03RAB | RABALIAS NEW HIRE | 40/50 |
| 19OQRCIP | RECIPROCATING COMPRESSOR UNITS | 20/30 |
| 19REFNEW | REF-CHEM NEW HIRE | 30/40 |
| 19REFREF | REF-CHEM REFRESHER | 20/30 |
| 19RHHOU | ROHN & HAAS – DP BP & LONESTAR | 20/30 |
| 07SFE_EXT | SAFETY EVALUATION TEST | |
| 19SCAFUS | SCAFFOLD USER | 20/30 |
| 19SDPTAO | SHELL DEER PARK TURNAROUND ORIENTATION | 20/30 |
| 08SHMONS | SHELL/ MOTIVA NORCO SITE ORIENTATION | 30/40 |
| 08SPSMNS | SHELL/ MOTIVA NORCO SITE ORIENTATION - Spanish | 20/30 |
| 19STS | SPECIALTY TANK SERVICE | 30/40 |
| 19SIPI | STRONGHOLD INSOECTIONS & PREMIER MECHANICAL INTEGRITY | 30/40 |
| 19SULZER | SULZER CHEMTECH | 20/30 |
| 19THORPE | THORPE CORPORATION | 20/30 |
| 19TRACER | TRACER INDUSTRIES | 20/30 |
| 19OQUPRT | UP-RATING PIPELINE SYSTEMS | 20/30 |
| 12USI | USI INDUSTRIAL SERVICES NEO | 20/30 |
| VLE04 | VALERO BUNDLE PAD OPERATIONS | 20/30 |
| VLE03A | VALERO CONFINED SPACE | 20/30 |
| VLE01 | VALERO ENERGY MEMPHIS SITE ORIENTATION | 20/30 |
| VLE05 | VALERO LDAR AWARENESS | 20/30 |
| VLE02 | VALERO LOCKOUT TAGOUT | 20/30 |
| VLE06 | VALERO RCRA TRAINING | 20/30 |
| 07VR | VALERO REFININF SITE SPECIFIC ORIENTATION | 40/50 |
| 07VRARHF | VALERO REFINING ARDMORE HF ACID | 30/40 |
| 07VRARD | VALERO REFINING ARDMORE SITE SPECIFIC ORIENTATION | 30/40 |
| 08VALERO | VALERO ST. CHARLES SITE SPECIFIC | 25/35 |
| 03VTRA | VALERO THREE RIVERS ALKY WEB | 20/30 |
| 03VTRS | VALERO THREE RIVERS SITE WEB | 40/50 |
| VLE07 | VALERO VPP TRAINING | 20/30 |
| 19OQVALV | VALVE MAINTENANCE | 20/30 |
| 19OQVOPR | VALVE OPERATORS | 20/30 |
| 19OQVICS | VAULT INSPECTION | 20/30 |
| 19OQWQUL | WELDER QUALIFICATION | 20/30 |
| 19OQWRPR | WWLD REPAIRS & PROCEDURES | 20/30 |
| 19WYATT | WYATT FIELD SERVICE | 20/30 |